Thumbnet.net header graphic

Thumb National BankErrers Home Furnishings Tina Seley Harbor Beach
Huron PropaneThumb Area TransitCourtney ManorPort Austin State BankHarbor Beach Community Hospital Walk In Clinic
Bad Axe OrthodonticsShaw AgencyBresky Siding and BuildingRolands Paint And More

Area News Headlines

These news headlines brought to you by these fine sponsors:

Osentoski Bad Axe Scheurer Hospital AVCI.net A-1 TRUCK A&B Auto Repair Morrel Equipment Advanced Auto Glass JW Hunt Lundy Financial Services Tec Fiber Internet Services Tri-Country Equipment East Side Tire Maurer Electric ABC Oil and Gas
Lundy Financial Services Tec Fiber Internet Services Tri-Country Equipment East Side Tire Maurer Electric ABC Oil and Gas Osentoski Bad Axe Scheurer Hospital AVCI.net A-1 TRUCK A&B Auto Repair Morrel Equipment Advanced Auto Glass JW Hunt
AVCI.net A-1 TRUCK A&B Auto Repair Morrel Equipment Advanced Auto Glass JW Hunt Lundy Financial Services Tec Fiber Internet Services Tri-Country Equipment East Side Tire Maurer Electric ABC Oil and Gas Osentoski Bad Axe Scheurer Hospital
A&B Auto Repair Morrel Equipment Advanced Auto Glass JW Hunt Lundy Financial Services Tec Fiber Internet Services Tri-Country Equipment East Side Tire Maurer Electric ABC Oil and Gas Osentoski Bad Axe Scheurer Hospital AVCI.net A-1 TRUCK
JW Hunt Lundy Financial Services Tec Fiber Internet Services Tri-Country Equipment East Side Tire Maurer Electric ABC Oil and Gas Osentoski Bad Axe Scheurer Hospital AVCI.net A-1 TRUCK A&B Auto Repair Morrel Equipment Advanced Auto Glass

 

Repairs and clean up kept Sebewaing's DPW busy

Mary Drier / Posted by: Deena Bruderick

Mon, 15 Jul 2024 17:06:41 EDT

 


click on the picture to enlarge






June was a busy month for the Sebewaing DPW with several projects completed.

The department poured four yards of concrete around the catch basin that Kemp Tiling Company replaced on Seventh Street, and one yard of concrete was poured for the gutter pan from the catch basin replacement.

Workers also replaced the rubber backflow flap on pump two at the Main lift station, aerators were installed in pond one, trees were trimmed, the crosswalks were painted, and there were 76 loads of brush hauled away.

Besides the department's standard duties, they had to do the setup and tear down for the sugar festival, which took about 59 hours to do along with 17 hours of overtime.

In other matters, a new paint striper was approved at a cost of about $5,000 or less, emergent lighting was ordered for the village office and for the Main lift station that the DPW staff will install when they arrive.

There was also a discussion on the possible removal of the horseshoe pits, transferring the gazebo to the Third and Fredrick streets park, and to relocate the shed to the South diamond, but there was no action taken on the issues.


   

 

 

Copyright © 2010 - 2024 Thumbnet.net and Thumb Broadcasting Incorporated

An equal opportunity employer EEO Report

Privacy Policy | WLEW-FM Public File | WLEW-AM Public File | WHST-FM Public File | FCC Applications | Official Car Sweepstakes Rules

WebReady powered by WireReady® NSI

The Pasta House PIGEON CHAMBER McVey Insurance D&m Cabinet GREENSTONE FARM CREDIT SERVICES Peppermill Old Time Tree Service Burkhard Heating and Cooling